Railway Engineering

We have so far executed projects comprising works such as Alumino thermit welding of 2.5 million rail joints including manufacturing of Alumino thermit welding portions and its accessories, 7000 kms of complete rail renewals, 6000 of Kms Destressing of track ,Gas pressure butt welding of rails, Installation of Ballasted track for 400 kms. It includes long tunnels, tall viaducts, deep cuttings, high banks for Gauge conversion projects, Doubling of track, New lines, private siding lines, Assembling of Track turnouts, insertion of SEJ, Glued joints including supply of PSC sleepers for track, Turnouts, SEJ, Bridges, Ballast, and rail fastenings with Konkan Railway, Indian Railways, Rail Vikas Nigam Limited and private siding lines in India. Among all contractors of Konkan Railway/India,

we are the only one firm selected to be their associate for execution of track works and technology partner for the projects of Mussayeb – Karbala-Samawa Railway project in the Republic of Iraq, Jamuna Bridge Railway Link project, Bangladesh and entered into pre award MOU with Konkan Railway/India as we have executed highest length of 120 kms track linking in very difficult location and thermit welding of rails joints 700 kms of Konan Railway with good quality and speedy work. We have been invited to associate with the Technical team of Konkan Railway for Designing and bidding for the Republic of Iraq, Bangladesh projects and we have visited both the projects.